To the central content area

2018 Plan of Taitung County’s Implementation of Water Pollution Source Inspection, Water Pollution Fee Collection Check and and Biogas Residue as Farmland Fertilizer Use Plan

Absrtact
(1) Application for water pollution prevention and control and examination of documents: The project has accepted and completed the review of 110 applications, and 236 applications have been filed. In addition, 6 applications have not been submitted for the extension of the application time. The cut has been completed in the second half of 2017 (2017/07/01-2017/12/31), the first quarter of 2018 (2018/01/01-2018/03/31), and the first half of 2018 (2018/ 01/01-2018/06/30), the second quarter of 2018 (2018/04/01-2018/06/30), the third quarter of 2018 (2018/07/01-2018/10/31), etc. 4 Sub-regular inspection report review. Each month, the water licenses (documents) that have been valid for less than 6 months and have not been applied for extension are included in the survey. Currently, there are 5 applicants who have not yet applied for extension. (2) Water pollution source verification and sampling and testing operations: Since November 30, 329 inspections have been completed, the completion rate is 100%; 93 water quality sampling and testing operations have been completed, and the completion rate is 100%, respectively, in line with the contract. The first phase of the second paragraph (1) and (2) of Article 2(1) of the contract stipulates that active and active inspections and sampling will be carried out continuously for key stations and key targets. At present, 10 in-depth inspections have been completed. The inspection targets are Taidong County Agricultural Association East Travel Season Resort, Taipei Rongmin General Hospital Taitung Branch, Dongtai Hostel Co., Ltd., National Taitung College Chengpu Campus, and Luye Ding Development. Co., Ltd., Ruiqi Sandstone Co., Ltd., Xingdong Xingye Co., Ltd., Foyu Enterprise Co., Ltd. Jilin Factory, Dijingze Co., Ltd., Chengtai International Investment Co., Ltd. Taitung Branch THE GAYA HOTEL, related results As in Section 3.2.3, and continue to track the progress of the period. (3) Functional assessment of wastewater treatment facilities in the pipeline business: This year's functional assessment operation completed the on-site evaluation (initial evaluation) of the Taitung Plant of the China National Pulp Co., Ltd. and the Chengtai Campus of the National Taitung College on June 22, 2007. On July 26, 107, the same experts and scholars (Mr. Ji Changguo and Huang Huiyuan) conducted on-site re-evaluation operations, including written data review and process and processing facility surveys, as well as site unit water quality sampling, etc., and please fill in the check and survey records. According to the results of water quality analysis, the function evaluation meeting of the evaluated units was held on August 8, 107, and August 9, 2007. During the year, the review of the functional assessment of the wastewater treatment facilities in the county from 102 to 106 years was carried out, and the missing objects were all improved. (4) Automatic monitoring of water quality and quantity (view) and connection transmission facilities System stable operation: The plan is to confirm the connection of the connected objects daily (the day of work on the office), and maintain the operation of the host equipment of the management connection transmission facility system. Cooperate with the monthly work execution progress reporting agency. This year, we reviewed and counseled the changes to the implementation instructions for the completed CWMS business “Foyu Enterprise Co., Ltd. Jilin Factory”. (5) Water pollution control fee collection check and application effectiveness evaluation: The plan also checks the water pollution fee for the check object during the in-depth inspection, and according to the EPA, the county water pollution fee should be checked for 18, at 107 Reply before June 30 of the year. On June 26, 107, the plan was sent to the county's first water pollution fee inspection report to the Environmental Protection Bureau, including 18 designated inspections and 4 general inspections. In addition, in conjunction with the in-depth inspection, three water pollution charges were actively checked in July, and one water pollution fee was actively checked in August. The first phase of the 107th year of the county (paid in January 2007) should declare 112 households, the reporting rate is 100%, the total amount of payment is 1,290,212 yuan; the second phase of 107 (paid in July 107) should be declared 114 Home, the reporting rate is 100%, and the total payment amount is 1,480,171 yuan. (6) Domestic sewage pollution reduction operations: The project uses domestic environmental protection activities, publicity meetings and briefings to conduct domestic sewage publicity, and has completed 8 life sewage publicity operations; April 10 letter to the sightseeing hot area assessment The pollution reduction method was applied as a feasibility assessment method, and the assessment object was Green Island. The evaluation report was sent on May 14. (7) Handling water pollution regulations and policies and publicity briefings and inspection control education and training: In response to the amendments to the relevant regulations on water pollution at the end of 106, the plan has completed the first briefing session on April 16th. The project manager of the project was promoted in the conference room of Taitung University. In the second session, the project manager of the project planned a briefing on the construction site runoff wastewater reduction plan on September 28, and the third session on October 12 invited the Environmental Protection Department of the Executive Yuan Environmental Protection Department Zhang Genmu to address the water pollution control law. The waste (sewage) water management plan for the industry will be explained and explained; on August 31, the project will complete the water pollution inspection regulations and skills education and training, indoor commentary and field operations, and will be hired by the deputy head of the Environmental Protection Department Inspectorate. Mr. Huang Huiyuan is a lecturer. The propaganda products are approved by the authorities and divided into three sections, and the storage space restrictions of the institutions are considered, and they are submitted in batches according to the actual promotion period. They are all delivered on April 10, June 6, and August 3. Completed 800 promotional items. In addition, the project has assisted in the preparation of 10 press releases related to water environmental protection, which were published on the website of the Environmental Protection Agency and Facebook after the approval of the Environmental Protection Agency. (8) Assisting the authorities in handling the performance appraisal of river pollution remediation and marine pollution prevention and control business: on March 1st, according to the review letter of the Environmental Protection Agency, the review comments were sent back, and on March 6th, the Environmental Protection Agency agreed to verify the verification; it was in 107 years. On April 13th and September 7th, 107th, each time the dry water period and the flood season were completed, the Fengliqiao water volume supplementary survey was sampled. In addition, on August 31, September 28, October 30, November 30, etc., respectively, the letter of the 107th Taitung County River Rehabilitation Project Report was released in August, September, October and November edition. On December 5th, it was sent to the key station KPI of 108 years in Taitung County. (9) Handling the water environment patrol team Jingxi Jingchuan and empowerment training activities: The project has completed 5 sessions of Jingxi Jingchuan and publicity education activities; completed the county from May 3rd to May 4th. 1 appearance of the appearance of the event; on October 22, the operation of the counseling meeting 1 time, and this year's evaluation of the excellent patrol team awards. (10) Assisting the operation of the Water Environment Patrol Team: This project has assisted in the notification of 45 cases registered in the "Water Environment Conservation Network"; on May 24th, we sent a micro-film execution plan (including script and film planning). The Bureau agreed to prepare for the investigation on May 29, and submitted the results of the microfilm shooting on July 30; assisted the Environmental Protection Agency on the operation and interview of the Southern District River Conservation Center on June 1; on September 15 The daily results are sent to the assessment results report and briefing (first draft), and the assessment results report and briefing (confirmed) will be sent before October 15. (11) Promoting the use of animal husbandry and feces: On March 13, the project invited the Chief of the Environmental Protection Agency, Zhang Genmu, to serve as the lecturer of the livestock, manure, urine and biogas slurry as a lecturer on the use of agricultural land fertilizers; and invited on March 23rd. Zhang Jizhong, deputy researcher of Taitung Agricultural Reform Farm, served as a lecturer, and each of Taitung City and Guanshan Town handled one farmer's matchmaking briefing; a total of 10 animal husbandry (4 cattle breeding and 6 pig breeding) were selected as biogas residue. The application for the plan for the use of biogas slurry farmland has been assisted by 10 animal husbandry in December to obtain a letter of consent. (12) Other matters for cooperation: According to the instructions of the Environmental Protection Agency, assist the organization to collect and produce business reports on the water environment patrol team, water pollution prevention, animal husbandry, manure, urine, biogas slurry and fertilizer use; Or training 8 times; on April 26, the letter was sent to the county's river water pollution incident emergency response plan, the bureau approved on May 1; February 23rd held the patrol team leader meeting (the first), 3 On the 7th of the month, assisted in the Taipingxi patrol team meeting, on April 3rd, the patrol team leader meeting (the second) and the captain's letter of appointment ceremony.
Keyword
Water Pollution, Water Pollution Fees, River Assessment, Biogas Residue as Farmland Fertilizer Use Plan
Open
top